Fighting for victims of Asbestos Exposure
Email this page to a friend Print this page

WWW.FINZFIRM.COM
1-888-FINZFIRM
1-888-346-9347
Finz & Finz, P.C.
Attorneys And Counselors At Law

EPA Study Looks For Better Asbestos Removal Technology

May 17, 2007 | Staff | Pollution Online

Washington, D.C. - The Environmental Protection Agency today announced the release of a draft report that evaluates an alternative demolition process for buildings containing asbestos. Scientists and engineers from EPA's National Risk Management Research Laboratory and the Dallas regional office compared the current process of demolishing a dilapidated, asbestos-containing structure with a new method called the Alternative Asbestos Control Method or AACM.

The first demonstration project was successfully completed in Fort Chaffee, Arkansas. Preliminary findings show the AACM procedures to be protective for cleanup of many asbestos-containing buildings.

Two similar buildings containing similar types and quantities of asbestos were demolished in April 2006. One demolition utilized the alternative method, and one utilized the standard National Emissions Standards for Hazardous Air Pollutants (NESHAP) method. As the buildings were demolished, environmental emissions were monitored to determine if the alternative protected the environment as well as the NESHAP method.

The current NESHAP process involves removal of some asbestos materials prior to demolition of a structure. This process can be time-consuming and expensive. After demolition, the removed asbestos and the demolished structure are both disposed of in approved landfills.

Similarly, the alternative method removes some friable (capable of becoming airborne) asbestos materials, but some asbestos-containing materials are allowed to remain. The structure is then wetted with amended water to control asbestos fiber release prior to and during demolition. Demolition debris and several inches of affected soil from the AACM process are disposed of as asbestos-containing debris at an approved landfill.

Data from the evaluation demonstrated lower than expected levels of asbestos and reduced potential for worker exposure. The cost and time savings for the first study were also found to be significant.


(required) Denotes required field


Title


(required) First Name


(required) Last Name


(required) Email Address


(required) Phone Number


Address


City


(required) State


Zip Code


Best Way/Time to Contact You


Injured Person's Name


Injured Person's Date of Birth
(mm/dd/yyyy)

Date of Incident
(mm/dd/yyyy)

Type of Incident


Please Describe the Incident


Please sign me up for the Finz & Finz, P.C. Newsletter


I agree to the Finz & Finz, P.C. Terms of Use